Name: Bridge Replacement – Local Road over a tributary to West Arrowwood Creek Location: 1 mile South of Ensign, AB Client: Vulcan County Project Cost: $162,645 Construction Dates: December 2 – 16, 2014 Previous Structure: Single Span, 6.1 m treated timber bridge on treated timber substructure. New Structure: Double 2400 mm Corrugated […]
Bridge File 8472: Bridge Replacement
Name: Bridge Replacement – Local Road over tributary to the Little Bow River Location: 9 miles east of Nanton, AB Owner: Municipal District of Willow Creek No. 26 Project Cost: $177,325 Construction Dates: July 3 – 18, 2012 Previous Structure: Single Span, 8.5 m treated timber girder bridge. New Structure: Double 2700 mm Corrugated […]
Bridge File 548: Bridge Replacement
Name: Bridge Replacement – Local Road over Cripple Creek west of Claresholm, AB Location: 12 miles west of Claresholm, AB Owner: Municipal District of Willow Creek No. 26 Project Cost: $191,750 Construction Dates: October 16 – 30, 2012 Previous Structure: Single Span, 8.5 m treated timber girder bridge. New Structure: Double 2700 mm Corrugated […]