Great news! Roseke Engineering has received its Cerficate of Recognition (COR) from the Alberta Construction Safety Association (ACSA). The Certificate of Recognition is the highest level of safety certification a company can achieve with the ACSA. It demonstrates an ongoing commitment to safety in all areas of the business. Firms must submit to annual safety […]
Archives for February 2013
Welcome to the New Website
Welcome to the new Roseke Engineering website. Definitely have a look around and if you have any questions, drop me a line at bernie.roseke@roseke.com. I’m excited about the work that we are doing and will be doing in the future. We came flying out of the gate in 2011 and I can now safely say […]
Bridge File 8472: Bridge Replacement
Name: Bridge Replacement – Local Road over tributary to the Little Bow River Location: 9 miles east of Nanton, AB Owner: Municipal District of Willow Creek No. 26 Project Cost: $177,325 Construction Dates: July 3 – 18, 2012 Previous Structure: Single Span, 8.5 m treated timber girder bridge. New Structure: Double 2700 mm Corrugated […]
Bridge File 548: Bridge Replacement
Name: Bridge Replacement – Local Road over Cripple Creek west of Claresholm, AB Location: 12 miles west of Claresholm, AB Owner: Municipal District of Willow Creek No. 26 Project Cost: $191,750 Construction Dates: October 16 – 30, 2012 Previous Structure: Single Span, 8.5 m treated timber girder bridge. New Structure: Double 2700 mm Corrugated […]