Archives for February 2013

We are COR Certified!

Great news! Roseke Engineering has received its Cerficate of Recognition (COR) from the Alberta Construction Safety Association (ACSA). The Certificate of Recognition is the highest level of safety certification a company can achieve with the ACSA.  It demonstrates an ongoing commitment to safety in all areas of the business.  Firms must submit to annual safety […]

Welcome to the New Website

Welcome to the new Roseke Engineering website. Definitely have a look around and if you have any questions, drop me a line at bernie.roseke@roseke.com. I’m excited about the work that we are doing and will be doing in the future.  We came flying out of the gate in 2011 and I can now safely say […]

Bridge File 8472: Bridge Replacement

Name: Bridge Replacement – Local Road over tributary to the Little Bow River Location: 9 miles east of Nanton, AB Owner: Municipal District of Willow Creek No. 26 Project Cost: $177,325 Construction Dates: July 3 – 18, 2012   Previous Structure:  Single Span, 8.5 m treated timber girder bridge. New Structure:  Double 2700 mm Corrugated […]

Bridge File 548: Bridge Replacement

Name: Bridge Replacement – Local Road over Cripple Creek west of Claresholm, AB Location: 12 miles west of Claresholm, AB Owner: Municipal District of Willow Creek No. 26 Project Cost: $191,750 Construction Dates: October 16 – 30, 2012   Previous Structure: Single Span, 8.5 m treated timber girder bridge. New Structure: Double 2700 mm Corrugated […]