Fullerton Loop Trail Bridge

 

Project Name: Fullerton Loop Trail bridge
Location: Kananaskis Country, AB
Description: Installation of a new trail bridge at approx. km 2.0 on the Fullerton Loop Trail

 

Roseke Engineering Ltd designed this trail bridge on the Fullerton Loop Trail in the Kananaskis Country, Elbow River District west of Bragg Creek, AB.  The bridge is a steel girder design with a steel subdeck and timber deck on two layers of precast concrete lock blocks.

Since the site was approximately 2 km into the backcountry, it was designed to be transported to the site in pieces.  Each steel member was brought to the site with using quads and trailers, and the bridge was bolted together on site without any welding.

Furthermore, the bridge is 3.7 m wide (clear deck width) which accommodates heavy equipment so that the rest of the trail system (past that point) can be accessed with maintenance equipment.

Alberta Environment & Parks has received an excellent bridge link on their system.

Our bridge team has performed hundreds of bridge sized culvert projects and we would love to help you with yours:

Bernie Roseke, P.Eng., PMP is the founder and president of Roseke Engineering Ltd.  He has 20 years experience in the design of rural bridges, culverts, and drainage structures, primarily for Counties, M.D.’s and Alberta Transportation.

Levi Ober, P.L.(Eng.) is our bridge manager and responsible for delivering bridge projects on time and budget.  He has 14 years experience in the assessment, design and construction supervision experience on County, M.D. and Alberta Transportation bridges.  He has designed every type of standard bridge and bridge sized culvert, and he is a class B bridge inspector.

Riley Johnson, T.T. is our junior bridge technologist.  He has assisted with design and performed construction supervision services on numerous bridge projects, and his enthusiasm for bridge work is very high.

Please call us at (403)942-6170. We would love to speak with you.