Bridge File 8472: Bridge Replacement

Name: Bridge Replacement – Local Road over tributary to the Little Bow River
Location: 9 miles east of Nanton, AB
Owner: Municipal District of Willow Creek No. 26
Project Cost: $177,325
Construction Dates: July 3 – 18, 2012

 

Previous Structure:  Single Span, 8.5 m treated timber girder bridge.

New Structure:  Double 2700 mm Corrugated Steel Pipe culverts with a 39 m invert length.

Roseke Engineering was engaged by the Municipal District of Willow Creek No. 26 as the prime consultant for this bridge replacement project.  We were responsible for all project phases including preliminary engineering, detailed design, tender preparation, tender opening and award, construction supervision, and project conclusion.