BF 1753: Bridge Replacement

 

Name: Bridge Replacement –
Local Road over Etzikom Coulee near Stirling
 
Location: 5 miles SW of Wrentham, AB
Client: County of Warner
   
   

 

Previous Structure:  Three span, 3 x 8.5 m precast concrete girder bridge on a treated timber substructure.

New Structure:  Three span, 8 m – 12 m – 8 m type SL-510 precast girder bridge on a steel substructure.

Roseke Engineering was engaged by Warner County, as the prime consultant for this bridge replacement project.  We were responsible for all project phases including preliminary engineering, detailed design, tender preparation, tender opening and award, construction supervision, and final details.