As of June 2016, the Etherington Creek campground in Kananaskis Country has a new structure on its access road. Roseke Engineering designed, tendered, and managed the construction of the new structure. This arch structure is made out of corrugated aluminum and rests on concrete footings. It is a 7.301 m wide by 1.743 m long Corrugated […]